BUDGETING, BUDGETARY CONTROL AND PERFORMANCE EVALUATION: A CASE STUDY OF ALLTERRAIN SERVICE GROUP (ATS).


BUDGETING, BUDGETARY CONTROL AND PERFORMANCE EVALUATION: A CASE STUDY OF ALLTERRAIN SERVICE GROUP (ATS).  

ABSTRACT

The prevailing uncertainties in Africa business environment today, most managers and stakeholders must poised to compete favourably under these rapidly changing conditions. In order to survive under these environmental complexities and vagueness, managers and stakeholders of the hospitality industry need a sharp tools, proven management techniques to forecast the major changes which are likely to affect the business while they choose future directions and dimensions of resources needed to attain selected goals. This research was work conducted with special reference to Budgeting, Budgetary Control and Performance Evaluation system of Allterrain Services Group with the view to ascertain the role that the budget plays in the company and how the key actors of the budget engage its uses in their daily operational activities. Budget as a profit planning device sets standard of performance of managers, while budgetary control is a tool implored by management to keep track of actual performance to ensure budgeted standards are met. In the course of this research work 44 workers at various managerial levels were taken as sample population. A well designed questionnaire was used to obtained data through personal interview and administration of the questionnaires, both qualitative and quantitative methods were used in analysing the data collected, secondary data source was also used. The analysis of the findings conclusively indicates that most of the key actors do not work with the budget due to lack of proper induction and proper role profile of the office they occupied.

TABLE OF CONTENTS

DECLARATION ii

DEDICATION iii

ACKNOWLEDGEMENT iv

ABSTRACT v

TABLE OF CONTENTS vi

LIST OF TABLES ix

CHAPTER ONE 1

THE PROBLEM AND ITS SETTING 1

1.0 Introduction 1

Background of the Study2

Problem Statement7

Objectives of the Research8

Research questions:9

Scope of the Study9

Significance of the Study9

Organization of the Study10

CHAPTER TWO 12

LITERATURE REVIEW 12

Introduction12

Literature Review and Theoretical Framework12

The Concept of Budgeting and Budgetary Control16

Main Types of Budget19

Other Types Budget20

The Principal Budget Factors/Forecasting22

ATS Budget Manual23

Budget Cycle - 'Finding Time'23

Corporate Governance24

Budget Manual Objectives24

Stakeholders Objectives25

Budget Process, Roles and Responsibilities27

The Basic Principles29

Process Assumptions29

Budget Review Process Flowcharts30

Budget Review: Key Dates31

Quarterly Review: Key Dates: First Week in below months32

December: Budget Review Meeting - Management33

Budget Review Meeting - Main Board33

Budget Education34

Budgeting: Financial and Human resources34

Problems associated with budgeting and control35

Performance of Allterrain Service (ATS): General Overview38

Budgetary Control and Variance Analysis39

The Causes of Variance in ATS Operation40

Data Presentation and Analysis of Variance42

CHAPTER THREE 46

METHODOLOGY 46

Introduction46

Research Design46

Source of Data48

Primary Sources:48

Secondary Sources:48

Population Size49

Sampling Technique49

Research Philosophy50

CHAPTER FOUR 50

RESULTS DISCUSSION AND ANALYSIS 51

4.1 Introduction 51

4.2. Skills, Knowledge and Abilities 51

Analysis of Budget-based Knowledge52

Analysis on Monthly Performance Report.54

ATS Budget - Based Motivation (Bonus)56

Participatory Budgeting58

ATS Activity-Based Budgeting Approach Analysis61

Discussions64

CHAPTER FIVE 66

SUMMARY OF FINDINGS, CONCLUSIONS AND RECOMMENDATIONS 66

Introduction66

Summary of findings66

Conclusions68

Recommendations68

Limitations of the Study70

Suggestion for Further Research71

REFERENCES 72

APPENDICES 75

LIST OF TABLES

Table 2.1: Monthly performance report for April 2012. (ATS Monthly Report) 22

Table 2.2: Hierarchy of Variances (Financial Management Development, David Palmer 2000) 41

Table 2.3: Actual vrs Budget performance in millions of US Dollars (Turnover) (ATS Budget Report) 42

Table 2.4: Graphical representation of the data in Table 2 43

Table 3.1 Source: Chika Agu 'budgeting and budgetary Control in Business Organisation' 44

Table 3.2: The population size of the research 49

Table 4.1: Sex distribution of the respondents 51

Table 4.2 Responds to Q1 “do you know there is a budget for your project?" 53

Table 4.3: Q5 Responds 55

Table 4.4: Budget Review and Participation. 58

Table 4.5 Do you feel discourage if the performance is bad 60

Table 4.6: An overview of Activity-based budgeting approach 63

CHAPTER ONE

THE PROBLEM AND ITS SETTING

1.0 Introduction

Following the uncertainties prevailing in Africa business environment today, managers and stakeholders must poised to compete favourably under these rapidly changing conditions. In order to survive under these environmental complexities and vagueness, managers and stakeholders of the hospitality industry need a sharp tools, proven management techniques to forecast the major changes which are likely to affect the business while they choose future directions and dimensions of resources needed to attain selected goals. Budgetary control as a proven management tool (Chandler, 1990) helps organization management, enhances improved performance of any economy in a different ways. Its primary function is to serve as a guide in financial planning operation; it also establishes limits for departmental excesses. It helps administrative officials to make careful analysis of all existing operations, thereby justifying, expanding, eliminating or restricting present practice (Musselman and Hughes, 1981).

Budgeting and control entails a distinct pattern of decisions in an organization which is capable of determining its objectives, purpose or goals, and how these goals are achieved by establishing principal policies and plans. However, the inability to recognize the problem concerned and fixing a boundary of investigation creates an obstacle for the successful implementation of budgeting and control. Some organizations only look for narrow ranges of alternatives which they arrive at from their past experiences and present situations, other management levels even avoid

long-term planning and budgeting in favour of today‟s problems thereby making the problems of tomorrow more severe (Steward 1993). The foregoing reflects on the need for organizations to set up a formal mechanism for scanning its environment for opportunities and give early signs of future problems, this course of action will improve the system of budgeting and control, resulting in an a priori expectation of improved performance in the hospitality industry and in ATS for that matter.

Background of the Study

This research intends to deep-dived and gained deeper understanding of how budgeting affect performance measurement of Allterrain Services Group, what kind of budgetary control measures is been put in place and how effective the control measures are. There will be two areas of concern in this study, that‟s budgeting in business organization (catering/ hospitality industry) for that matter, and how performance is measured or evaluated against the budget.

The primary characteristic of businesses all over the world involves setting goals to which money are connected or allocated. From these goals, specific objectives are delineated and funds are subdivided among them. Budgeting also provide information and data of past performance and thereby proceeds to allow for meaningful comparisons between „expected‟ and „actual‟ progress. Adjustments are at times made to the current budget or the future budget preparations cycle to close any performance gaps that may exist. In all, the budget provide a vital tool for project evaluations, for any ad hoc many measures to be taken if the need arise which is a vital tool for decision makers, more especially the management and main board members of the organization.

To narrow it down to ATS as a corporate entity, budgeting will serves as:

i. An indicator of costs and revenues that are linked to the daily operational activities of the project managers in the various camps of operation

ii. A way of providing information and supporting management decisions throughout the year

iii. And a means of monitoring and controlling the business, particularly analyzing the differences between the budget and actual.

The geneses of ATS budgeting always originate from the scope of work (SOW) in the tender document of the client. And tender budget is then designed form this scope of work which inform management decision on the viability of the prospective project, whether to bid or not to bid. The source of revenue on this budget emanate from the senior and junior catering sales, shop and bar sales, expediting sales, management fixed fee, party catering sales, room, offices and recreational centres cleaning and employees charged out, whilst the cost of sales normally, is a constitute of senior and junior catering consumptions, shop and bar consumption, expediting expenses, party catering consumption and that of cleaning. Also included in the cost of sales are food spoilage, stock variance, and non-stock consumables. The scope of work mainly centred on:

i. The number of senior and junior mandate

ii. The senior and junior casual meals to be served

iii. Whether there will be bar and commissary services

iv. The number of room to be cleaned

v. The total area per square meters to be cleaned for offices and recreational centres.

This scope of work gives an idea as to the calibre and number of employees needed to execute the task imbedded in the scope of work, how many local and foreign chefs to be recruited depending on the multi-cultural nature of the camp and the type of menu that the client requested. Camp or Project managers needed for the project are most at times left at the discretion of ATS or at times are a requirement from the client. The number of expatriates on a particular project informs the management fixed fee to be charged.

The budget CaPex enumerate the type of assets that is required of the project depending on the type of project and facility which are readily available and this will in effect inform ATS about the amount of mobilization fee that will be needed to procure the assets. There are two types of mobilization fees

i. A mobilization fee is given for the acquisition of the assets that would belong to the client at the end of the contract;

ii. A mobilization fee will be paid back on the monthly basis which is deducted from the monthly invoices where the assets will be owned by ATS.

Budgeting and Accounting have different meaning among managers and planners and the personnel who use these. Both are critical components that must interact to achieve the goals and objectives of the organization. Accounting is a system use to record, classify, and summarize business operation (Meigs 1996). The role of keeping the financial information and on-going analysis necessary to provide management and outside interest with the facts necessary for decision making is also considered (Grig, 1988). Relying on certain standard and Generally Accepted Accounting Principles (GAAP), the accountant of the company will develop and

report data to measure firm performance; to assess its financial position, to comply

with and file report needed by security regulators; to file and pay taxes; and to prepare a balance sheet, financial statements and the cash flow of the company to recognize sales revenue, expenses etc. when they incurred. Therefore, accountants provide accounting information used for individuals external to an organization such as shareholders, customers, suppliers, tax authorities as well as for employees and the internal managers of the organization. Financial accounting will ensure that the assets and liabilities of the business are properly accounted for, and provide information about the profits etc. to shareholders and other interested parties. In contrast, management accounting system provides information specifically for the use of managers within an organization to assist in decision making (Ryna et. al 2002). Based on classification above, budgeting is, traditionally, classified under management accounting domain by the existing accounting literature. In this sense, budgeting is a narrower concept with more specific focus. (Hrongren 2002) budget focuses on a forthcoming accounting period, rather than on the past period on which accounting is based to make records. Therefore, budget planning focuses more on a forecast purpose to estimate what is likely to occur and how organizational resources are allocated to realize future operations. Moreover, another important aspect of budgeting will be that of the feedback, in which both the plan and the action will be compared, providing the opportunity to revise future budget in line with experienced.

Budgeting in finance literature is concerned with the planning and management of firm‟s financial needs, concerning the alternative sources of and cost of finance. The financial needs of the firms are embodied in capital budgeting decisions on projects within the firm. The money flow are from the capital market into the firm and into the project, the project in turn generate funds which are used to pay interest on loans

and repayment, as well as to fund non-capital costs. Any surplus can be used either as a profit/dividend payments or re-invested.

As a common example of a financial plan in management accounting, however, budgeting pays attention to the administrative function internal to a firm, especially in terms of planning and control. Budgeting is viewed as a critical element of management as mentioned by a number of scholars (Anthony, 1965; Flamholt, 1983; Otley and Pollanen, 2000; Otley, 2003). Given the control-required standards against which performance could be assessed, the budget will be the natural standard of comparison. This leads to using the budget with an annual planning period; in practice in many organizations this was subdivided into quarters or sometimes months, as the fundamental building block of the control measure, but this happens quarterly in ATS.

Budget provide a basis for directing and evaluating the performance of individuals or segment of organizations and also will structure the decision making environment (Bruns & Waterhouse, 1975), so they appear to be appropriate as a control devices impacting performance of organizations. Therefore, a considerable stream of research (Schiff & Lewin, 1970; Onsi, 1973; Brownell, 1985; Merchant & Manzoni, 1980; Kren, 1992; Van der Stede, 2000) emphasize the function of budgeting in management control process and sought to explore the influence of budgetary controls on organizational behaviour. Shield and Young (1993) define budgetary participation as the involvement of managers in the budgetary process and their influence over setting budgetary targets. They state that participative budgeting is a control response to the need by organizations to gain an understanding of their

environment, to assist in problem solving, more importantly to promote information sharing among administrative levels and finally to enhance performance.

Problem Statement

There is no gainsaying the fact that ATS assess the viability of   each project based on comparing the actual against the budgeted from which the decision are made either to kill the project or to revisit the negotiation table for a better deal. Bonus to motivate employees to put up their best in the operation which is also based on performance measurement is also not left out. The Key Performance Indicators (KPIs) are also centred on the budget. The budget therefore, for ATS is the engine of decision making, the core pillar around which every decision on any project is derived. Sensing the sensitivities of the role of the budget in ATS operation and the decision-making body, it is incumbent on the budget manager to get very reflective budget information that throws more light on the actual situations on the ground.

This research therefore is, set out to investigate factors contributing to budgetary ineffectiveness. The study examines the budgeting, budgetary control and performance at ATS which gives rise to the following questions:

i. How is the budgeting participatory process at ATS?

ii. Do managers neither understand the principles underlying the budget nor understand the importance of budgeting and budgetary control in relation to their projects.

iii. What are the manager‟s approaches to information requested to address their budget challenges.

iv. How do the project managers link their daily operational costing to the benchmark set in the budget?

v. How do managers factor the addendum in relation to changes in scope of work to the budget?

Meanwhile the lack of budget information flow from the project managers as an input into the budget process can be very gravy to the company decision. A new interactive approach to information collation should therefore be adopted, next alternative could be site visit by the Budget Manager as well as to work with the Project accountants for the update; engage project managers in education on the relevance of budget to project performance and its effect on bonus payment. Hence this exercise is meant to go beyond the financial report and investigate the vast differences between the operating budget and the actual, the role of project managers in the budgeting process and the understanding of the budget and the budgetary control measures by the project managers.

Objectives of the Research

The main purpose of this study is to establish the relationship between budgeting, budgetary control and performance measurement/evaluation. The exploratory inquiries into the activities of the project managers will be an attempt to discover or identify potential variables regarding the budgeting and performance relationship. The studies compare the actual performance to the budgeted and try and relate the gaps to the theoretical budget. The objectives of this study is:

i. to explore the theoretical impact of budgeting on performance measurement in ATS

ii. to establish the relationship between a change in scope and theoretical budget

iii. to unravel the essence of participatory budgeting and

iv. finally, to further investigate how effective are the budgetary control measures in budgeting

Research questions:

From the problem statement above, the central question to this study is to understand

„how the change in scope of work affects theoretical budget and performance evaluation? There are four sub questions to derive from this:

i. what are the budgeting procedures in ATS

ii. how do we define the role of project managers in the budgetary procedures

iii. what are the fundamental causes of changes in scope of work

iv. how do we measure performance in ATS

Scope of the Study

In order to understand the challenges of project managers in participatory budget process, this dissertation will focus and be limited to project managers working in various projects in ATS.

Significance of the Study

The significance of this study will enhance and contribute to realistic budget and budgeting procedures in ATS. It will improve and present a clearer picture of daily activities of the project managers on site. This exercise will help ATS to be in a better position to take a decisive decision on the futuristic state of any project.

Human resource allocation and project managers reshuffling among the group will be

based on the performance of the project and this research will help management in effective delivery of this task.

This research will also help ATS management to include certain clauses in the contract during their round-table negotiations, more especially when scope of work is hike in a tender document of the client in terms of meal numbers for which the benefit of economy of scale is awarded, ATS should be able to withdraw such benefit and give a full rates when the actual turn out to be -10% of the numbers budgeted for after the contract is awarded. This research will also help investors to have confidence in the budget figures because of its participatory process that will show the true picture of situation on the ground in terms of cost and revenue and the types of corrective measures been put in place to shape and direct the shortfalls in the operation.

It is therefore envisaged that the outcome of this finding will contribute tremendously to the search of solutions to the crippling effect on budget, budgetary control and performance evaluation/measurement. This research will trigger a review of project manager recruitment policy, a review of job description of project accountant to be an agent of budget information delivery on each project.

Organization of the Study

This dissertation is organized into five (5) chapters. The chapter one (1) covers the introductory aspect of this research and gave an in-depth knowledge of why this topic worth investigating. Chapter two (2) will look at the theoretical framework of the necessary literature review. This will basically focus on existing theories and knowledge related to budgeting and performance measurement in ATS. The

researcher will then attempt to find the impact of budgeting on performance while considering other potential variables interference. Chapter three (3) will explain the chosen methodology design for all empirical questions in detail. It will also include the rational for chosen a combine research method; deciding on the methods of data collection and what data have to be collected; will describe the function of qualitative data and quantitative data in this study; will discuss how to provide questionnaires and conduct interview. The fourth (4th) chapter will represent a comprehensive presentation of data analysis whilst chapter five (5) which is the last chapter will summarize the contribution of this research to the existing budgeting and performance literature and ATS budgetary practice, pointing out the limitations of this research and also give recommendation for future research.

.

BUDGETING, BUDGETARY CONTROL AND PERFORMANCE EVALUATION: A CASE STUDY OF ALLTERRAIN SERVICE GROUP (ATS).



TYPE IN YOUR TOPIC AND CLICK SEARCH.






RESEARCHWAP.ORG

Researchwap.org is an online repository for free project topics and research materials, articles and custom writing of research works. We’re an online resource centre that provides a vast database for students to access numerous research project topics and materials. Researchwap.org guides and assist Postgraduate, Undergraduate and Final Year Students with well researched and quality project topics, topic ideas, research guides and project materials. We’re reliable and trustworthy, and we really understand what is called “time factor”, that is why we’ve simplified the process so that students can get their research projects ready on time. Our platform provides more educational services, such as hiring a writer, research analysis, and software for computer science research and we also seriously adhere to a timely delivery.

TESTIMONIES FROM OUR CLIENTS


Please feel free to carefully review some written and captured responses from our satisfied clients.

  • "Exceptionally outstanding. Highly recommend for all who wish to have effective and excellent project defence. Easily Accessable, Affordable, Effective and effective."

    Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.
  • "I saw this website on facebook page and I did not even bother since I was in a hurry to complete my project. But I am totally amazed that when I visited the website and saw the topic I was looking for and I decided to give a try and now I have received it within an hour after ordering the material. Am grateful guys!"

    Hilary Yusuf, United States International University Africa, Nairobi, Kenya.
  • "Researchwap.org is a website I recommend to all student and researchers within and outside the country. The web owners are doing great job and I appreciate them for that. Once again, thank you very much "researchwap.org" and God bless you and your business! ."

    Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.
  • "Great User Experience, Nice flows and Superb functionalities.The app is indeed a great tech innovation for greasing the wheels of final year, research and other pedagogical related project works. A trial would definitely convince you."

    Lamilare Valentine, Kwame Nkrumah University, Kumasi, Ghana.
  • "I love what you guys are doing, your material guided me well through my research. Thank you for helping me achieve academic success."

    Sampson, University of Nigeria, Nsukka.
  • "researchwap.com is God-sent! I got good grades in my seminar and project with the help of your service, thank you soooooo much."

    Cynthia, Akwa Ibom State University .
  • "Sorry, it was in my spam folder all along, I should have looked it up properly first. Please keep up the good work, your team is quite commited. Am grateful...I will certainly refer my friends too."

    Elizabeth, Obafemi Awolowo University
  • "Am happy the defense went well, thanks to your articles. I may not be able to express how grateful I am for all your assistance, but on my honour, I owe you guys a good number of referrals. Thank you once again."

    Ali Olanrewaju, Lagos State University.
  • "My Dear Researchwap, initially I never believed one can actually do honest business transactions with Nigerians online until i stumbled into your website. You have broken a new legacy of record as far as am concerned. Keep up the good work!"

    Willie Ekereobong, University of Port Harcourt.
  • "WOW, SO IT'S TRUE??!! I can't believe I got this quality work for just 3k...I thought it was scam ooo. I wouldn't mind if it goes for over 5k, its worth it. Thank you!"

    Theressa, Igbinedion University.
  • "I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much researchwap.com, infact, I owe my graduating well today to you guys...."

    Joseph, Abia state Polytechnic.
  • "My friend told me about ResearchWap website, I doubted her until I saw her receive her full project in less than 15 miniutes, I tried mine too and got it same, right now, am telling everyone in my school about researchwap.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work"

    Christiana, Landmark University .
  • "I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!."

    Musa, Federal University of Technology Minna
  • "I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!."

    Ali Obafemi, Ibrahim Badamasi Babangida University, Niger State.
  • To contribute to our success story, send us a feedback or please kindly call 2348037664978.
    Then your comment and contact will be published here also with your consent.

    Thank you for choosing researchwap.com.