PERCIEVED CONTRIBUTIONS OF STAKEHOLDERS TO FAILURE OF BUILDING PROJECTS IN NIGERIA


PERCEIVED CONTRIBUTIONS OF STAKEHOLDERS TO FAILURE OF BUILDING PROJECTS IN NIGERIA  

TABLE OF CONTENTS

Title Page    -    -    -    -    -    -    -    -    -   

Approval Page    -    -    -    -    -    -    -    -   

Declaration    -    -    -    -    -    -    -    -   

Dedication    -    -    -    -    -    -    -    -    -   

Acknowledgement    -    -    -    -    -    -    -   

Abstract    -    -    -    -    -    -    -    -    -   

Table of Contents    -    -    -    -    -    -    -   

CHAPTER ONE – INTRODUCTION

1.1    Background of the Study    -    -    -    -    -   

1.2    Statement of the Problem    -    -    -    -   

1.3    Objectives of the Study    -    -    -    -    -    -   

1.4    Research Questions    -    -    -    -    -    -   

1.5    Research Hypothesis    -    -    -    -    -    -   

1.6    Significance of the Study    -    -    -    -    -   

1.7    Scope of the Study    -    -    -    -    -    -   

1.8    Limitations of the Study    -    -    -    -    -

1.9    Definition of Terms    -    -    -    -    -    -   

CHAPTER TWO – REVIEW OF RELATED LITERATURE

2.1    Introduction    -    -    -    -    -    -    -   

2.2    Theoretical Framework    -    -    -    -    -   

2.3    Conceptual Framework    -    -    -    -    -   

2.4    Empirical Review    -    -    -    -    -    -

CHAPTER THREE – RESEARCH METHODOLOGY

3.1    Introduction    -    -    -    -    -    -    -   

3.2    Research Design    -    -    -    -    -    -   

3.3    Population of Study    -    -    -    -    -    -   

3.4    Sample size and Sampling Techniques    -    -    -   

3.5    Method of Data Collection    -    -    -    -    -   

3.6    Research Instrument

3.7    Validity of the Instrument    -    -    -    -    -   

3.8    Reliability of the Instrument    -    -    -    -   

3.9    Sampling Method    -    -    -    -    -    -   

CHAPTER FOUR – DATA PRESENTATION AND ANALYSIS

4.1    Introduction    -    -    -    -    -    -    -   

4.2    Data Presentation and Analysis    -    -    -    -   

4.3    Testing Hypothesis    -    -    -    -    -    -   

CHAPTER FIVE – SUMMARY, CONCLUSION AND RECOMMENDATION

5.1    Summary    -    -    -    -    -    -    -    -   

5.2    Conclusion    -    -    -    -    -    -    -    -   

5.3    Recommendations    -    -    -    -    -    -   

    References -    -    -    -    -    -    -    -   

Appendix    -    -    -    -    -    -    -    -

CHAPTER ONE

INTRODUCTION

1.1    BACKGROUND OF THE STUDY:

The rate of completion of construction projects falls below the rate at which they are perceived. This study focuses on 3 key stakeholders in the delivery of building projects. They are the client, contractors and consultants. Dlakwa and Culpin (1999) stated that, the main cause of this failure is the delay experienced in the delivery of the project.

Scott (1993) stated that the completion of construction projects within prescribed time scale is an important measure of project success. Basically, all the efforts of these persons involved in building project are directed towards completing the job within the estimated construction cost, period and quality. Hence, the actual construction cost, period and the quality of projects are measures of the success or failure of building projects. This study recognized the role of the stakeholders to the delivery of projects by categorizing the factors according to the stakeholders responsible for the failure.

Therefore, a failed construction project can be defined as that which is not completed within the estimated construction cost and construction period. Construction project failure is seen as a function of time and cost, meaning that for a project to fail at a particular period of time and cost, does not mean that it cannot serve its purpose in the near future.

The degree of project failure varies and has been classified as partial and total project failure.

Partially failed construction projects are considered to be any project which exceeds the estimated construction cost and/ or construction period with or without experiencing suspension for a period of time   (the forefront of this research). Totally failed construction projects are projects which commence on site but are not completed and there is no intention of completion (Idebi, 1990).

In as much as these stakeholders involved in construction projects wish that the project be completed within the estimated construction cost and period, they in their own way contribute to construction project failure. Other factors identified as responsible for project failure outside the stakeholders factors are government policies, inflation and force majeure. Therefore the study was focused at identifying the perception of the clients, contractors and consultants in failure of building project.

1.2    STATEMENT OF THE RESEARCH PROBLEM

Considering the view of various writers on construction projects, it is believed that a construction project is successful when it is completed within the estimated construction cost, construction time and construction quality.

Studies on project failure have been focused on the causes and have identified several causes of the failure which results into dispute in construction project. Therefore, time and cost overruns are seen as a conflicting tool that can lead to failure in construction projects. So, it is important to identify the key contributory issues that cause failure from the side of the client, contractors and consultants so as to proffer ways to reduce their incidents.

1.3    AIM AND OBJECTIVES OF THE STUDY: 

1.3.1 AIM

The study aims at identifying the perception of the clients, contractors and consultants in failure of building project.

1.3.2 OBJECTIVES

The objectives of this study are:

To examine the contributions of client, consultant and contractor to building failure and other causes beyond their control. To identify the effect of building failure on the stakeholders. To assess the remedial actions for the identified contribution of stakeholders to building failure.

1.4    NEED FOR THE STUDY: 

                     The extra cost and time over the estimated construction cost and period have made it difficult for the construction industry to meet up to the demand of her products. The need for this study is that, in order for the construction industry to meet up to the demands for her products, an end must be put to construction project failure. The success of construction projects to an extent depends upon the stakeholders involved in the delivery of projects and this can be achieved by the application of a combination of technological knowhow and professional management of these stakeholders to remedy or control deficiencies in construction.

1.5    SCOPE AND LIMITATION OF THE STUDY: 

This study is limited to building construction firms and government organisations who are involved in building construction projects only, located within Abuja and Kaduna metropolis. Moreover, it laid emphasis on building construction projects that have been completed or ongoing between the past 20years until date, which must have experienced construction project failure that complies with the definition of project failure. The stakeholders of interest shall include the clients, contractors and consultants.

.

PERCIEVED CONTRIBUTIONS OF STAKEHOLDERS TO FAILURE OF BUILDING PROJECTS IN NIGERIA



TYPE IN YOUR TOPIC AND CLICK SEARCH.






RESEARCHWAP.ORG

Researchwap.org is an online repository for free project topics and research materials, articles and custom writing of research works. We’re an online resource centre that provides a vast database for students to access numerous research project topics and materials. Researchwap.org guides and assist Postgraduate, Undergraduate and Final Year Students with well researched and quality project topics, topic ideas, research guides and project materials. We’re reliable and trustworthy, and we really understand what is called “time factor”, that is why we’ve simplified the process so that students can get their research projects ready on time. Our platform provides more educational services, such as hiring a writer, research analysis, and software for computer science research and we also seriously adhere to a timely delivery.

TESTIMONIES FROM OUR CLIENTS


Please feel free to carefully review some written and captured responses from our satisfied clients.

  • "Exceptionally outstanding. Highly recommend for all who wish to have effective and excellent project defence. Easily Accessable, Affordable, Effective and effective."

    Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.
  • "I saw this website on facebook page and I did not even bother since I was in a hurry to complete my project. But I am totally amazed that when I visited the website and saw the topic I was looking for and I decided to give a try and now I have received it within an hour after ordering the material. Am grateful guys!"

    Hilary Yusuf, United States International University Africa, Nairobi, Kenya.
  • "Researchwap.org is a website I recommend to all student and researchers within and outside the country. The web owners are doing great job and I appreciate them for that. Once again, thank you very much "researchwap.org" and God bless you and your business! ."

    Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.
  • "Great User Experience, Nice flows and Superb functionalities.The app is indeed a great tech innovation for greasing the wheels of final year, research and other pedagogical related project works. A trial would definitely convince you."

    Lamilare Valentine, Kwame Nkrumah University, Kumasi, Ghana.
  • "I love what you guys are doing, your material guided me well through my research. Thank you for helping me achieve academic success."

    Sampson, University of Nigeria, Nsukka.
  • "researchwap.com is God-sent! I got good grades in my seminar and project with the help of your service, thank you soooooo much."

    Cynthia, Akwa Ibom State University .
  • "Sorry, it was in my spam folder all along, I should have looked it up properly first. Please keep up the good work, your team is quite commited. Am grateful...I will certainly refer my friends too."

    Elizabeth, Obafemi Awolowo University
  • "Am happy the defense went well, thanks to your articles. I may not be able to express how grateful I am for all your assistance, but on my honour, I owe you guys a good number of referrals. Thank you once again."

    Ali Olanrewaju, Lagos State University.
  • "My Dear Researchwap, initially I never believed one can actually do honest business transactions with Nigerians online until i stumbled into your website. You have broken a new legacy of record as far as am concerned. Keep up the good work!"

    Willie Ekereobong, University of Port Harcourt.
  • "WOW, SO IT'S TRUE??!! I can't believe I got this quality work for just 3k...I thought it was scam ooo. I wouldn't mind if it goes for over 5k, its worth it. Thank you!"

    Theressa, Igbinedion University.
  • "I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much researchwap.com, infact, I owe my graduating well today to you guys...."

    Joseph, Abia state Polytechnic.
  • "My friend told me about ResearchWap website, I doubted her until I saw her receive her full project in less than 15 miniutes, I tried mine too and got it same, right now, am telling everyone in my school about researchwap.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work"

    Christiana, Landmark University .
  • "I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!."

    Musa, Federal University of Technology Minna
  • "I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!."

    Ali Obafemi, Ibrahim Badamasi Babangida University, Niger State.
  • To contribute to our success story, send us a feedback or please kindly call 2348037664978.
    Then your comment and contact will be published here also with your consent.

    Thank you for choosing researchwap.com.