THE IMPACT OF MATERIAL REQUIREMENT PLANNING IN MANUFACTURING INDUSTRY


THE IMPACT OF MATERIAL REQUIREMENT PLANNING IN THE MANUFACTURING INDUSTRY  

TABLE OF CONTENT

Title Page………………..i

Certification………….…ii

Dedication………………iii

Acknowledgement……….iv

Table of content……...…v

CHAPTER ONE: INTRODUCTION

1.1    Background of the Study.        -    -    -    -    -    -    1

1.2    Statement of the Problems-    -     -    -    -    -    -    4

1.3    Objectives of the Study    -    -    -    -    -    -    -    4

1.4    Statement of Hypothesis    -    -    -    -    -    -    -    5

1.5    Significance of the Study        -    -    -    -    -    -    5

1.6    Scope of the Study        -    -    -    -    -    -    -    6

1.7    Limitations of the study     -    -    -    -    -    -    -    6

1.8    Historical Background of PAN        -    -    -    -    -    7

1.9    Definition of Terms    -    -    -    -    -    -    -    10

CHAPTER TWO: LITERATURE REVIEW

2.1    The Concept of Materials Requirement Planning    -    -    -    12

2.2    Materials Requirement Planning (MRP) objectives    -    -    -    15

2.3    Materials Requirement Planning (MRP) as a Planning Tool    -    16   

2.4    Methodology of a MRP project implementation/Alternative Techniques        -    -    -    -    -    -    -    -    19

2.5    Material Requirement Planning (MRP) Inputs     -    -    -    20

2.6    Organizational Measures for Effective Material Requirement Planning Implementation    -    -    -    -    -    -    -    -    22

2.7    Master Production Scheduling (PP-MP-MPS) and MRP    -    -    25   

2.8    Benefits of Material Requirement Planning (MRP)        -    -    28

CHAPTER THREE: RESEARCH METHODOLOGY

3.1    Research Design    -    -    -    -    -    -    -    -    31

3.2    Research Population    -    -    -    -    -    -    -    32

3.3    Sample Size and Sampling Techniques    -    -    -    -    32

3.4    Methods of Data Collection    -    -    -    -    -    -    33

3.5    Justification for the Instrument Used    -    -    -    -    -    34

3.6    Method of Data Analysis        -    -    -    -    -    -    34

3.7    Justification of Method Used    -    -    -    -    -    -    34

CHAPTER FOUR: Presentation of Data and Analysis

4.1    PRESENTATION OF DATA

4.2    DATA ANALYSIS

CHAPTER FIVE: Summary of Findings, Conclusion and Recommendations

5.1    SUMMARY OF FINDINGS

5.2    Discussion of Findings

5.3    Implication of Findings

5.4    Conclusions

5.4    Recommendations

5.6    Suggestion for Further Studies

Bibliography

Questionnaire

CHAPTER ONE

INTRODUCTION

1.1     BACKGROUND OF THE STUDY

Production is the transformation of one set of resources into a second set. In order to describe the constraints and opportunities for production, different methods have been developed through the years both in the practical engineering context and from an academic point of view (Grubbström, 1995). For the multi-level, multi-stage production-inventory system, an analysis applying the combined methodology of input-output analysis and the place transform has proven to be useful.

In practice, the managerial information system dealing with multi-level, multi-stage production-inventory systems is referred to as Material Requirements Planning (MRP). Here, product complexity as well as lead times are essential ingredients. In this research we allow these terms to be used in a synonymous way both for the theoretical analysis and as a name for the corresponding practical information system.

In a multi-level manufacturing system finished products, subassemblies, components, raw materials, etc., (items), are distinguished. MRP reduces a master production schedule of finished products into a time-phased suggested schedule of requirements of intermediate items to be manufactured and purchased, based on the estimated external demand for finished products. This “parts explosion” determining requirements from higher levels down to lower levels (upstream to downstream) traces the product structures.

Material Requirements Planning (MRP) is a computer-based inventory management system designed to assist production managers in scheduling and placing orders for dependent demand items. Dependent demand items are components of finished goods—such as raw materials, component parts, and subassemblies—for which the amount of inventory needed depends on the level of production of the final product. For example, in a plant that manufactures bicycles; dependent demand inventory items might include aluminium, tires, seats, and derailleurs.

The first MRP systems of inventory management evolved in the 1940s and 1950s. They used mainframe computers to explode information from a bill of materials for a certain finished product into a production and purchasing plan for components. Before long, MRP was expanded to include information feedback loops so that production personnel could change and update the inputs into the system as needed. The next generation of MRP, known as manufacturing resources planning or MRP II, also incorporated marketing, finance, accounting, engineering, and human resources aspects into the planning process. A related concept that expands on MRP is enterprise resources planning (ERP), which uses computer technology to link the various functional areas across an entire business enterprise.

MRP works backward from a production plan for finished goods to develop requirements for components and raw materials. "MRP begins with a schedule for finished goods that is converted into a schedule of requirements for the subassemblies, component parts, and raw materials needed to produce the finished items in the specified time frame," William J. Stevenson wrote in his book Production/Operations Management. MRP breaks down inventory requirements into planning periods so that production can be completed in a timely manner while inventory levels—and related carrying costs—are kept to a minimum. Theoretically, it is often asserted that, when implemented and used properly, MRP can help production manager’s plan for capacity needs and allocate production time. However, it is also argued that MRP systems can be time consuming and costly to implement, which may put them out of range for some small businesses. In addition, the information that comes out of an MRP system is only as good as the information that goes into it. Thus, for MRP to be successfully implemented and sustained, current accurate bills of materials, part numbers, and inventory records must be maintained. These and similar, issues relating to the concept and practice of MRP is what this research work intends to examine.

1.2    STATEMENT OF THE PROBLEMS

As stated earlier, MRP is a planning technique designed to assist production manager in scheduling and placing orders for dependent demand items such as raw materials, component parts and sub-assemblies relative to the desired level of production. However, it has been observed that the technique is not yet very popular among organization. Not only that, it is also argued that the system is so time consuming and costly that not every organization can adopt it.

In this research work, attempts have been made to critically assess the possible contribution of the MRP technique to the efficiency of manufacturing organization with particular focus on production cost.

1.3    OBJECTIVES OF THE STUDY

The objective of this study is to examine Material Requirement Planning as it ensures availability of material in an organization. The specific objectives are:

1.    To highlight the usefulness of MRP in PAN.

2.    To identify the various materials related operational problems in PAN that can be handled by the application of the MRP technique.

3.    To provide knowledge for future research work.

1.4    STATEMENT OF HYPOTHESIS

The study shall be guided by this hypothesis, thus;

H0:    Material Requirement Planning is not a strategy for cost reduction in manufacturing organization

H1:    Material Requirement Planning is a strategy for cost reduction in manufacturing organization

1.5    SIGNIFICANCE OF THE STUDY

The significance of this research work cannot be over emphasized because it is a requisite for the award of higher National Diploma in Production and Operations Management.

The study will help manufacturing organizations to appreciate and understand MRP as it affects productivity and reveal ways in which it could be applied for desired benefits.

Students in business and management studies can also expand their knowledge base from this research work. It can also be used as a reference material and a base for further research.

To the government, the study will introduce an efficient system of production planning to replace the traditional, inefficient practices found in public corporations.

1.6    SCOPE OF THE STUDY

This research work covers the Material Requirement Planning (MRP) as a cost reduction strategy in a manufacturing concern. It however, limits it scope to PAN Kaduna.

1.7    LIMITATIONS OF THE STUDY

1)    Finance: with the present doomed financial situation the researcher finds it difficult to purchase necessary materials for the project at reasonable cost and also to carryout other relevant facts find exercise with ease.

2)    Time constraint: It is very important for one to get enough time to accurate and up to date, but the time available for this work is not adequate as a student, the researcher has to face the project, at the same time coupling with the class work, preparation for final examination as well as numerous assignments.

3)    Another problem is the acute shortage of qualified, skilled and experienced personnel to effectively provide the researcher with appropriate data in course carrying out the research.

1.8    HISTORICAL BACKGROUND OF PAN

The entry of most popular and favourite vehicle Peugeot brand into Nigeria dates back to 1957 when the first set of 100 units of Peugeot 403 car were imported by individual into the country. Within a period of two years Peugeot 403 became so popular as a result of its dependability, suitability in Nigeria roads that assumed the status of official cars for many top government officials and wealthy business people. This unprecedented achievement led to the appointment of SCOA in 1957 as the sole agent for Peugeot cars in Nigeria and imported the first set of 403 Peugeot cars.

Since independence in 1960, the growth rate of Nigerian economy had taken such a proportion that the number of imported cars could no longer cope with the demand, the military government of Nigerians opened negotiation with automobiles Peugeot of France for the setting up of an assembly plant in the country. That dream became reality when on December 15th 1972 Peugeot Automobiles of Nigeria was incorporated with an authorized share capital of N3, million and paid up capital of N2, million on 14th march, 1975 the assembly plant in Kaduna was commissioned by general Yakubu Gowon, the Head of state. That same year the first set of Nigeria Peugeot cars rolled out of the plant.

However, with time a further rise in demand for production at the plant in the country necessitated the federal government introduction of the structured adjustment programme (SAP). Since its inception, PAN has turned out over N370, 000 cars with total assets amounting to N1, Billion at the end of 1990.

OBJECTIVE OF PAN

The Peugeot automobile of Nigeria was established in 1975 with the following objective

To Chart a course for Nigerians industrialization in the area of assembly and manufacturing of automobiles vehicles

To engage in a local assembly or production of cars suitable to Nigerians physical environment and chaotic condition.

To produce vehicle spare parts and accessories

To reduce dependence on importing the automobile industry and therefore help conserve foreign exchange for the country.

To serve as an avenue for the transfer of technology by providing on the job training to Nigeria workers techniques and managers who would eventually develop technology usable in many aspect of the economic life of the country

To create employment opportunities for the growing arms of skills, semi skilled and unskilled Nigerians by developing on industrial network of supplies that would contribute to the establishment of basic technology in the field of machinery stamping manufacturing of plastic parts etc.

ORGANIZATION STRUCTURE

To function effectively, every business organizations need a structure which has the characteristics of unity, continuity, flexibility and predictability required for efficient interactions with its environment. The problem of planning and monitoring when management must overcome to be successful is to ensure that the objective of each part of the organization are securely welded together (unity) using both start and long term forecasting (continuity) being able to adopt the plan in the light of changing circumstances (flexibility) and attempting to accurately predict course of action (predicting) to meet the increasing challenges of its responsibility and expectation of its performance. At the apex of the pyramidal chart is a board of directors headed by a chairman appointed by the federal government. The board of directors is the highest hierarchy. The board responsibility is that of formulating policy guideline for implementation by the general management teams.

They plan, organize, set goals and formulate policies. The collective policies and decisions of the board are carried out by the chairman. The general management team is headed by a managing director (a foreigner) assisted by a deputy director (a Nigeria). Directly attached to the office are company’s secretary department and three functional department namely, internal audit, corporate planning and data processing.

There are four general managers who run the affairs of the company’s (4) major division. These divisions are personal, administration, commercial, finance and finally industrial.

1.9    DEFINITION OF TERMS

Quality: - this is the ability of a product to meet with customer expectation.

Materials: - these are components, parts, raw materials that are used to produce other goods that are kept in the storehouse.

Specification: - this is the detail description of requirement laid down for material component or process or service.

Quality control: - is the process of setting standard for acceptability of goods purchase or goods manufacture where actual is compare with expected quality.

Standard: - It is the level used as a measure for weight, length, quality, tests or for the required degree of excellence.

Inspection: - is the logic checking of conformance with specification or standard.

Monitoring: - Is the process of continuous inspection to see that tests are been carried out in accordance with specification.

Cost: monetary value of goods or service purchase.

Product: bundle of an item(s) that provide satisfaction, manufacturing output or performed services.

Reliability: - products or service that have all the characteristics expected of them in terms of functional performance, taste etc.

.

THE IMPACT OF MATERIAL REQUIREMENT PLANNING IN MANUFACTURING INDUSTRY



TYPE IN YOUR TOPIC AND CLICK SEARCH.






RESEARCHWAP.ORG

Researchwap.org is an online repository for free project topics and research materials, articles and custom writing of research works. We’re an online resource centre that provides a vast database for students to access numerous research project topics and materials. Researchwap.org guides and assist Postgraduate, Undergraduate and Final Year Students with well researched and quality project topics, topic ideas, research guides and project materials. We’re reliable and trustworthy, and we really understand what is called “time factor”, that is why we’ve simplified the process so that students can get their research projects ready on time. Our platform provides more educational services, such as hiring a writer, research analysis, and software for computer science research and we also seriously adhere to a timely delivery.

TESTIMONIES FROM OUR CLIENTS


Please feel free to carefully review some written and captured responses from our satisfied clients.

  • "Exceptionally outstanding. Highly recommend for all who wish to have effective and excellent project defence. Easily Accessable, Affordable, Effective and effective."

    Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.
  • "I saw this website on facebook page and I did not even bother since I was in a hurry to complete my project. But I am totally amazed that when I visited the website and saw the topic I was looking for and I decided to give a try and now I have received it within an hour after ordering the material. Am grateful guys!"

    Hilary Yusuf, United States International University Africa, Nairobi, Kenya.
  • "Researchwap.org is a website I recommend to all student and researchers within and outside the country. The web owners are doing great job and I appreciate them for that. Once again, thank you very much "researchwap.org" and God bless you and your business! ."

    Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.
  • "Great User Experience, Nice flows and Superb functionalities.The app is indeed a great tech innovation for greasing the wheels of final year, research and other pedagogical related project works. A trial would definitely convince you."

    Lamilare Valentine, Kwame Nkrumah University, Kumasi, Ghana.
  • "I love what you guys are doing, your material guided me well through my research. Thank you for helping me achieve academic success."

    Sampson, University of Nigeria, Nsukka.
  • "researchwap.com is God-sent! I got good grades in my seminar and project with the help of your service, thank you soooooo much."

    Cynthia, Akwa Ibom State University .
  • "Sorry, it was in my spam folder all along, I should have looked it up properly first. Please keep up the good work, your team is quite commited. Am grateful...I will certainly refer my friends too."

    Elizabeth, Obafemi Awolowo University
  • "Am happy the defense went well, thanks to your articles. I may not be able to express how grateful I am for all your assistance, but on my honour, I owe you guys a good number of referrals. Thank you once again."

    Ali Olanrewaju, Lagos State University.
  • "My Dear Researchwap, initially I never believed one can actually do honest business transactions with Nigerians online until i stumbled into your website. You have broken a new legacy of record as far as am concerned. Keep up the good work!"

    Willie Ekereobong, University of Port Harcourt.
  • "WOW, SO IT'S TRUE??!! I can't believe I got this quality work for just 3k...I thought it was scam ooo. I wouldn't mind if it goes for over 5k, its worth it. Thank you!"

    Theressa, Igbinedion University.
  • "I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much researchwap.com, infact, I owe my graduating well today to you guys...."

    Joseph, Abia state Polytechnic.
  • "My friend told me about ResearchWap website, I doubted her until I saw her receive her full project in less than 15 miniutes, I tried mine too and got it same, right now, am telling everyone in my school about researchwap.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work"

    Christiana, Landmark University .
  • "I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!."

    Musa, Federal University of Technology Minna
  • "I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!."

    Ali Obafemi, Ibrahim Badamasi Babangida University, Niger State.
  • To contribute to our success story, send us a feedback or please kindly call 2348037664978.
    Then your comment and contact will be published here also with your consent.

    Thank you for choosing researchwap.com.